Quick Links - Main Sectors

> Commercial
> Education
> Healthcare
> Heritage
> Public Sector
> Residential
> Retail

> Full Client List - All Sectors


PROJECT DETAILS


Our Lady's Hospital for Sick Children, Crumlin
 
Client: Our Lady's Hospital
for Sick Children
   
Architect: Todd Architects
   
Main Contractor: Walls
   
Service Engineer: Varming Consulting Engineers

New Cystic Fibrosis Unit and Refurbishment of St. Michael’s Ward

This project involved a new Cystic Fibrosis Unit containing four single isolation rooms with ensuite bathrooms and rooming-in facilities for parents. The unit also contained a lounge/kitchenette for parents, a nurse station and storage areas. It was linked back to St. Michael’s Ward where a complete renovation and refit was completed providing for 22 new state of the art beds, cardiac and respiratory equipment and a playroom for physically and mentally disabled patients together with a revamped parent facility.

The Electrical Installation included the following:

  • Electrical Distribution and Wiring
  • General Services Installation
  • Lighting and Lighting Control
  • Fire Alarm Installation
  • Access Control System
  • Electrical Services associated with Mechanical Plant & Controls
  • Wiring of natural ventilation window actuators
  • Commercial IT structured cabling systems and infrastructure
  • Cabling to Building Management Systems (BMS)
  • Nurse Call System
  • Bed Head Trunking Installation

 

Client: Our Lady's Hospital
for Sick Children
   
Architect: Todd Architects
   
Main Contractor: John Sisk & Son
   
Service Engineer: Varming Consulting Engineers

BMT Unit and St John’s Ward

The new state of the art Bone Marrow transplant Unit contained a 4 bedded unit together with 7 new single rooms, all complete with ensuites and room in facilities for parents. There was also a new play zone. The upgrade in St. John’s Ward provided meeting/conference facilities, a redesigned drop-in area, medication/treatment room, central station for nurses and corridor. The existing fire alarm, nurse call and medical gas alarm systems were kept live and fully functional during the course of the works.

The Electrical Installation included the following:

  • Distribution Boards and Sub Main cables
  • Lighting and Emergency Lighting including intelligent lighting control systems
  • General Service & Small power Including Bedhead Trunking
  • Commercial IT structured cabling systems and infrastructure
  • Cabling to Building Management Systems (BMS)
  • Door Access System
  • Fire Alarm System
  • Nurse Call System
  • Installation of Medical Gases
  • Installation of Mechanical Plant Wiring
  • Security system

 

Client: Our Lady's Hospital
for Sick Children
   
Architect: Todd Architects
   
Main Contractor: Walls
   
Service Engineer: Varming Consulting Engineers

New Cystic Fibrosis Unit

Electrical Services installation in new Cystic Fibrosis Unit comprising of patient rooms, living area, nurse station and storage areas linked by corridor to St Michaels ward which was completely refurbished and provided for 22 new state of the art bedrooms, cardiac and respiratory equipment
and a playroom for physically and mentally disabled patients and a revamped parent facility.

The installation included lighting, general services, small power, fire alarm, Mechanical Services, Security, Door Access System, Nurse Call System, Medical Gases and PA system.

 
Top of page
© Vincent Doherty Ltd  |  All Rights Reserved  |  www.vdoherty.com  |  Contact Us  |  Terms & Conditions  |  Site Map
Site by SBW